Final copings have now been cemented on, they were heavy. 3 of us to lift them safely, he will be back after the drive has been done just to do the copings along the front wall, but can't do that until the level is sorted and the blocks laid, hopefully start the drive mid April.



I liked the stonework that much that I had the builder build a pillar for me right outside our front door


Seriously though, we decided to have a lean to type porch built to protect the entrance from the elements as we are a bit open up here, oak is being cut as I type.