Originally Posted by Mr Pointy Just to point out it's 1000m OR as high as the ridge, not AND. However the rest of the installation is such a shocker it's fairly moot. The glue in question doesn’t pass through the weather surface. Sent from my calculator using a lawnmower.
Forum Rules